Chilled water & Hot Water manifolds will be installed below the AHU.
Specific Humidity will be measured to remove moisture content.
Reheat will be occurred if it is an evident that there is no sensible heat.
Air flows will be measured and controlled through static pressure across the blower cone.
The actual flows of CHW / HW will be measured and displayed.
Cooling and Heating Loads will be measured and displayed.
Blower efficiency will be calculated and displayed.
FA and BA dampers can be controlled electronically.